Skip to Content
Streetsblog Chicago home
Streetsblog Chicago home
Log In
Bicycling

Alta Chief: Bike-Share Expansions Unlikely in 2014

Bixi
There was no shortage of Bixi bikes at this 2012 conference, but there is now. Photo: Dylan Passmore/Flickr

Despite continually growing ridership, Alta Bicycle Share-operated bike-share systems across America will probably not be adding bikes or docks this year. The bankruptcy of Montreal-based Public Bike Share Company, known as Bixi, which developed and manufactured the equipment that Alta's systems use, has disrupted the supply chain that numerous cities were pinning their expansion plans on.

"New bikes probably won’t arrive until 2015," reports Dan Weissmann at American Public Media's Marketplace. Alta Bicycle Share's founder and vice president Mia Birk told Weissman that the last time Alta received new bikes from Bixi "must have been pre-bankruptcy." That puts expansion plans for cities including Chicago, San Francisco, and Washington, DC on hold. Just those three cities had previously announced fully-funded plans to add 264 bike-share stations in 2014. New York and Boston are also looking to expand their Alta-run systems. Other bike-share systems that purchase equipment from Bixi, like Nice Ride Minnesota, have had no luck buying new kit this year.

The shortage of equipment also means that cities that had signed up with Alta to launch new bike-share systems -- notably Baltimore, Portland, and Vancouver -- won't launch until 2015 at the earliest. Ironically, new launches that were planned later, like Seattle's Pronto system, will proceed sooner, as they were designed with equipment not sourced through Bixi.

The good news is that the troubled supply chain for Alta's bike-share systems looks like it will be rebooted thanks to an infusion of capital. REQX Ventures, a company from New York City that had bid on Bixi, has been in talks to purchase a majority stake in Alta Bicycle Share, according to a report in Capital New York. This should inject new resources, allowing the bike-share operator to upgrade buggy software and overcome the hurdles imposed by Bixi's bankruptcy in time for 2015's equipment orders.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Chicago

Get on the bus! Advocates and organizations urge Mayor Johnson to take action to save the Greyhound Terminal

According to the letter, rehabbing the station would cost less that $40M, a small fraction of the price tag of many other local transportation projects.

July 23, 2024

Proposed Archer, Kedzie upgrades would be a big step forward to improve traffic safety on the Southwest Side

The planned improvements include a 4-to-3 road diet and slip lane removals on Archer, protected bike lanes, pedestrian upgrades, and bus boarding islands.

July 22, 2024

We are all in the underperforming Chicagoland transit network. But some of us are looking at the Star:Line.

According to Star:Line Chicago, "The 2034sight Plan is an ambitious — and achievable — ten-year framework to lay the groundwork to modernize Chicagoland’s existing local passenger rail system."

July 19, 2024
See all posts